The Government of the Republic of Zambia through parliament established the Constituency Development Fund (CDF) in 1995, under CAP 281 of the Laws of Zambia and Section 45 of the Local Government Act No. 2 of 2019 to support micro-community projects as part of the wider decentralization and local development policy. This fund was established to provide finances for micro economic programs at local level based on community needs.
The CDF remains a strategic tool for accelerating the decentralization agenda and promote sustainable local development in all constituencies in Zambia.
The Government of the Republic of Zambia has prioritised decentralisation as a major driver for attaining development, reducing poverty and supporting job creation through citizen engagement and participation at the local level.
To actualise decentralisation in line with the Constitution, the Government has decided to take significant resources from the Central Government to the Local Government level and in this regard, the Constituency Development Fund (CDF) has been identified as a major tool to take resources closer to the people.
The expanded scope of the CDF covers three (3) specific areas namely, Community Projects; Youth, Women and Community Empowerment and public Boarding School and Skills Development Bursaries.
The Constituency Development Fund (CDF) is established under Article 162 of the Constitution of Zambia (Amendment) Act No.2 of 2016 and operationalised by the Constituency Development Fund Act No. 11 of 2018.The Act provides for the management, disbursement, utilisation and accountability of the CDF.
In addition, there are pieces of legislation that are related and supportive to the management,
disbursement, utilisation and accountability of CDF which include among others:
(a.) PROCESSING A CDF APPLICATION
The submission shall be signed by the Chairperson of the WDC and accompanied by minutes of the Meeting of the Committee and the Zonal Assembly Meeting. Where the Chairperson is not available, the Vice Chairperson shall sign and where the Vice Chairperson is not available, the
21 Committee shall nominate a member amongst themselves who shall sign the
submission list;
A PLGO shall cause to be published the approved project list in the Gazette and any other electronic media platform, except that the requirement to publish shall not affect the implementation of an approved project.
Â
(b) DISBURSEMENT OF CDF FUNDS.
For successful CDF applicants; grants, bursaries and loans are credited directly into the appropriate bank accounts.
Â
Monitoring and Evaluation (M&E) follows to ensure correct use of the CDF, also to ensure that the correct beneficiaries receive the funds, and that the funded community projects are being developed.
| 2025 CDF PROJECTS - 2nd and 3rd QUARTER - KAWAMBWA CENTRAL CONSTITUENCY | |||||
|---|---|---|---|---|---|
| No. | Project Name | Sector | Status/Remarks (Mobilising, On going, DLP, suspended, terminated) | % Physical Progress | Comments |
| 1 | Procurement of Tipper truck 25 tonnes | Roads | Procured | 100.00% | procured and delivered |
| 2 | Procurement of Grader | Roads | Procured | 100.00% | procured and delivered |
| 3 | Procurement of Front-end Loader | Roads | Procured | 100.00% | procured and delivered |
| 4 | Procurement of Water Bowser | Roads | Procured | 100.00% | procured and delivered |
| 5 | Servicing of Equipment | Roads | Procurement | 5.00% | Awaiting Approval from Attorney General |
| 6 | Completion of Office Block at Civic Center | Local Governance | Procurement | 5.00% | Awaiting Approval from Attorney General |
| 7 | Procurement of Solar Equipment at Civic Center | Local Governance | Procurement | 5.00% | Awaiting Approval from Attorney General |
| 8 | Procurement of saver and office equipment at Civic Center | Local Governance | Procurement | 5.00% | Awaiting Approval from Attorney General |
| 9 | Renovation of the Office of the District Commissioner | District Administration | Procurement | 5.00% | Awaiting Approval from Attorney General |
| 10 | Procurement of Kawambwa District Hospital mortuary Solar Equipmemt | Health | DLP | 100.00% | Works have successfully been done by the contractor and are in defect liability period |
| 11 | Construction of two bedroomed staff house at Misakalala Health Facility | Health | On-going | 10.00% | Works have commenced and the contractor is currently doing the setting out of the foundation trenches |
| 12 | Construction of a two bedroomed staff house at Shikalaba Health facility | Health | On-going | 4.00% | Works have commenced and the contractor is currently doing the setting out of the foundation trenches |
| 13 | Construction of a two Bedroomed staff House at Muchulila Health facility | Health | On-going | 13.00% | Works have commenced and the contractor is currently mobilising resources needed for the concrete footing of the staff house |
| 14 | Construction of a two Bedroomed staff House at Kamfukeshi Primary School | Staff House | Mobilising | 1.00% | Works are scheduled to commence soon as the contractor is currently mobilising resources required for the works to start |
| 2025 CDF PROJECTS - 2nd and 3rd QUARTER - PAMBASHE CONSTITUENCY | |||||
|---|---|---|---|---|---|
| No. | Project Name | Sector | Status/Remarks (Mobilising, On going, DLP, suspended, terminated) | % Physical Progress | Comments |
| 1 | Procurement of Tipper truck 25 tonnes | Roads | Procurement | 0.00% | To be retendered |
| 2 | Procurement of Grader | Roads | Procured | 100.00% | Procured and delivered |
| 3 | Procurement of Excavator (21Tonne) | Roads | Procured | 100.00% | Procured and delivered |
| 4 | Servicing of Equipment | Roads | Procurement | 5.00% | Awaiting Approval from Attorney General |
| 5 | Completion of Office Block at Civic Center | Local Governance | Procurement | 5.00% | Awaiting Approval from Attorney General |
| 6 | Procurement of Solar Equipment at Civic Center | Local Governance | Procurement | 5.00% | Awaiting Approval from Attorney General |
| 7 | Procurement of saver and office equipment at Civic Center | Local Governance | Procurement | 5.00% | Awaiting Approval from Attorney General |
| 8 | Renovation of the Office of the District Commissioner | District Administration | Procurement | 5.00% | Awaiting Approval from Attorney General |
| 9 | Procurement of Kawambwa District Hospital mortuary Solar Equipmemt | Health | DLP | 100.00% | Works have successfully been done by the contractor and are in defect liability period |
| 10 | Construction of Health facility at Mawaya | Health | On-going | 41.00% | Works are still on-going and the contractor is currently doing the construction of the superstructure walls. |
| 11 | Construction of Water Scheme at Mawaya Health facility | Health | On-going | 10.00% | Awaiting Approval from Attorney General |
| 12 | Procurement od medical Equipment at Mawaya Health Facility | Health | On-going | 4.00% | Awaiting Approval from Attorney General |
| 13 | Construction of Health facility at Kuyumba | Health | On-going | 13.00% | Awaiting Approval from Attorney General |
| 14 | Construction of water at Kuyumba Health facility | Health | On-going | 1.00% | Awaiting Approval from Attorney General |
| 15 | Procurement of medical equipment for Kuyumba Health facility | Health | On-going | 1.00% | Awaiting Approval from Attorney General |
| KAWAMBWA COMMUNITY PROJECTS – 2023 | ||||
|---|---|---|---|---|
| S/N | Project Description | Ward | SECTOR | Comments |
| 1 | Procurement of roller compactor | All Wards | ROADS | Approved |
| 2 | Procurement of ambulance | All Wards | HEALTH | Approved |
| 3 | Procurement of desks | All Wards | EDUCATION | Approved |
| 4 | Procurement of low bed | All Wards | ROADS | Approved |
| 5 | Procurement of water bowser | All Wards | ROADS | Approved |
| 6 | Procurement of desks | All Wards | EDUCATION | Approved |
| 7 | Construction and rehab of maternity wings and borehore | Iyanga | HEALTH | Approved |
| 8 | Provision of water and sanitation at kawambwa boys | All Wards | WATER AND SANITATION | Approved |
| 9 | Procurement of solid waste equipments | All Wards | SANITATION | Approved |
| 10 | Purchase of Motor vehicle (CDF) | Lushiba | WORKS | Approved |
| 11 | Procurement of desks | All Wards | EDUCATION | Approved |
| 12 | Drilling and installation of 1no solar powered boreholes at Misakalala | Ntumbachushi | HEALTH | Approved |
| 13 | Procurement of furniture for mwangwe health post | Lushiba | HEALTH | Approved |
| 14 | Procurement of furniture for Misakalala health post | Ntumbachushi | HEALTH | Approved |
| 15 | Grading of roads in Kawambwa | Iyanga | ROADS | Approved |
| 16 | Procurement of desks | All Wards | EDUCATION | Approved |
| 17 | Provision of electricity | Kawambwa | ENERGY | Approved |
| 18 | CONSTRUCTION OF TWO TECHERS HOUSES AT KAPULO PRIMARY SCHOOL | IYANGA | EDUCATION | Not Approved due to limited funds |
| 19 | STAFF HOUSES AT MUYEMBE PR. SCH AND AT HEALTH CENTER | IYANGA | EDUCATION | Not Approved due to limited funds |
| 20 | CONSTRUCTION OF OUTREACH POST AT BULEMBE | IYANGA | HEALTH | Not Approved due to limited funds |
| 21 | WATER RETICULATION AT LDF PLOTS OR NEW PLOTS (near new hospital) | NG'ONA | WATER | Not Approved due to limited funds |
| 22 | TOWNSHIP ROADS IN NG'ONA WARD POLICE -HOSPITAL-MESSENGER-ST MARYS | NG'ONA | ROADS | Not Approved due to limited funds |
| PAMBASHE CDF COMMUNITY PROJECTS - 2023 | ||||||
|---|---|---|---|---|---|---|
| S/N | Year | Project Description | Constituency | Ward | Sector | Comments |
| 1 | 2023 | Procurement of ambulance | PAMBASHE | ALL WARD | HEALTH | Approved |
| 2 | 2023 | Construction of Mushota Police station phase 1 | PAMBASHE | ILOMBE | SECURITY | Approved |
| 3 | 2023 | procurement of Desks | PAMBASHE | ALL WARD | EDUCATION | Approved |
| 4 | 2023 | Construction of 1*2 CRB at nachampama primary school | PAMBASHE | ILOMBE | EDUCATION | Approved |
| 5 | 2023 | Construction of a maternity wing and drilling of a solar powered borehole at chitotela health post | PAMBASHE | KABANSE | HEALTH | Approved |
| 6 | 2023 | Construction Of Chiefs palance at Snr Chief Mushota | PAMBASHE | ILOMBE | TRADITIONAL AFFAIRS | Approved |
| 7 | 2023 | Construction Of Chiefs palance at Snr Chief Chama | PAMBASHE | MULUNDA | TRADITIONAL AFFAIRS | Approved |
| 8 | 2023 | procurement of desks | PAMBASHE | ALL WARD | EDUCATION | Approved |
| 9 | 2023 | Procurement of solid waste equipments | PAMBASHE | ALL WARD | SANITATION | Approved |
| 10 | 2023 | Provision of electricity | PAMBASHE | ALL WARD | ENERGY | Approved |
| 11 | 2023 | Purchase of police vehicle | PAMBASHE | ALL WARD | SECURITY | Approved |
| 12 | 2023 | procurement of desks | PAMBASHE | ALL WARD | EDUCATION | Approved |
| 13 | 2023 | procurement of desks | PAMBASHE | ALL WARD | EDUCATION | Approved |
| 14 | 2023 | Construction of chibote police post, staff house and borehole | PAMBASHE | MULUNDA | SECURITY | Approved |
| 15 | 2023 | Procurement of furniture for mweo and katota health post | PAMBASHE | MULUNDA | HEALTH | Approved |
| 16 | 2023 | CONSTRUCTION OF TEACHERS HOUSES AT /NTUMBO ZONE | PAMBASHE | CHIKANDA | EDUCATION | Not Approved due to limited funding. |
| 17 | 2023 | CONSTRUCTION OF HEALTH POST AT LUFUBU | PAMBASHE | CHIMPILI | HEALTH | Not Approved due to limited funding. |
| 18 | 2023 | CONSTRUCTION OF 1X2 CRB (FORM NOT SIGNED BY WDC) | PAMBASHE | CHIMPILI | EDUCATION | Not Approved due to limited funding. |
| 19 | 2023 | CONSTRUCTION OF 1X3 CLASSROOM BLOCK AT CHIMPILI PRIMARY SCHOOL (NOT SIGNED BY WDC) | PAMBASHE | CHIMPILI | EDUCATION | Not Approved due to limited funding. |
| 20 | 2023 | CONSTRUCTION OF 1X3 CRB AT KANENGO PRIMARY SCH | PAMBASHE | FILENGE | EDUCATION | Not Approved due to limited funding. |
| 21 | 2023 | CONSTRUCTION OF A PRE-SCHOOL AT CHAMA KAPWENGE (NOT SIGNED BY WDC) | PAMBASHE | FILENGE | EDUCATION | Not Approved due to limited funding. |
| 22 | 2023 | CONSTRUCTION OF 1X3 LABORATORY CLASSROOM AT KANENGO SECONDARY | PAMBASHE | FILENGE | EDUCATION | Not Approved due to limited funding. |
| 23 | 2023 | FEEDER ROAD CONSTRUCTION FROM KASAFYA TO CHIMFUMBWE | PAMBASHE | FILENGE | ROADS | Not Approved due to limited funding. |
| 24 | 2023 | CONSTRUCTION OF 1X3 CRB AT MWEO PRIMARY SCH. | PAMBASHE | FILENGE | EDUCATION | Not Approved due to limited funding. |
| 25 | 2023 | 1X3 CLASSROOM BLOCK AND THREE TEACHERS HOUSES AT MUKULUKA ZONE | PAMBASHE | FILENGE | EDUCATION | Not Approved due to limited funding. |
| 26 | 2023 | CONSTRUCTION OF HEALTH POST CHITALA ZONE COMMUNITY | PAMBASHE | MULUNDA | HEALTH | Not Approved due to limited funding. |
| Total |
| CDF COMMUNITY PROJECTS APPLICATIONS- 2022 | |||||||
|---|---|---|---|---|---|---|---|
| S/N | Year | Project Description | Constituency | Ward | Sector | Approved Amount | Comments |
| 1 | 2022 | Helath Post At Muchulila | Kawambwa | Kala | HEALTH | 770,000.00 | Approved |
| 2 | 2022 | construction of a 1*3 Class Room Block and ablution block at Parrafine | Kawambwa | Fisaka | EDUCATION | 1,328,000.00 | Approved |
| 3 | 2022 | 2 Staff Houses For Health Workers at Luatula Health post | Kawambwa | Senga | HEALTH | 810,000.00 | Approved |
| 4 | 2022 | Bus Station Paving | Kawambwa | Ngona | BUS STATIONS AND MARKETS | 575,846.21 | Approved |
| 5 | 2022 | Construction Of 1*3 Crb, And Ablution Block At Kalamba Primary School To Secondary School | Kawambwa | Ntumbachushi | EDUCATION | 1,109,000.21 | Approved |
| 6 | 2022 | Construction Of An Ablution Block at Munkanta Primary School | Kawambwa | Kawambwa | EDUCATION | 680,746.00 | Approved |
| 7 | 2022 | Grading And Gravelling Of Road From Muyembe To Kapulo Road | Kawambwa | Iyanga | ROADS | - | Approved |
| 8 | 2022 | Procurement Of 300 Desks | Kawambwa | All Wards | EDUCATION | 594,100.00 | Approved |
| 9 | 2022 | Construction Of 1*3 Classroom Block at Mufwaya Primary School | Kawambwa | Senga | EDUCATION | 503,000.00 | Approved |
| 10 | 2022 | Construction Of Borehole, Staff House at Mwangwe Haelth Post | Kawambwa | Lushiba | HEALTH | 675,000.21 | Approved |
| 11 | 2022 | Construction Of A Local Court at Katungulu | Kawambwa | Luena | JUSTICE | 550,846.00 | Approved |
| 12 | 2022 | Drilling and installation of 2no solar powered boreholes at shinonde community in kawambwa district of luapula province. | Kawambwa | Kala | WATER AND SANITATION | 540,000.00 | Approved |
| 13 | 2022 | Procurement For Desk To Be Distributed To Schools | Kawambwa | All Wards | EDUCATION | 390,000.00 | Approved |
| 14 | 2022 | Electrical Installation | Kawambwa | Iyanga | ENERGY | 50,000.00 | Not Approved due to limited funding |
| 15 | 2022 | Construction Of 3No. Solar Boreholes Communities chisulo, zakeyo and chola communities | Kawambwa | Ng'Ona | WATER/SANITATION | 810,000.00 | Approved |
| 16 | 2022 | Construction And Instalation 3 No.Solar Boreholes stardy, thomas n mutofwa | Kawambwa | Kawambwa | WATER/SANITATION | 840,000.00 | Approved |
| 17 | 2022 | Water Reticulation At Luatula, Mufwaya And Chisheta Community | Kawambwa | Senga | EDUCATION | 870,000.00 | Approved |
| 18 | 2022 | Construction Of Martenity Wing at Munkanta Clinic | Kawambwa | Kawmbwa | HEALTH | 843,846.21 | Approved |
| 19 | 2022 | Procument Of Desk | Kawambwa | All Wards | EDUCATION | 525,000.00 | Approved |
| 20 | 2022 | Construction Of Staff house at Kamfukeshi Clinic | Kawambwa | iyanga | HEALTH | 405,000.00 | Approved |
| 21 | 2022 | ROAD MAINTANANCE :KALA ROAD IN TWO WARDS NAMELY KALA AND SENGA (RDA)SPOT MAINTAINANCE | Kawambwa | ROADS | 1,722,332.00 | Not Approved due to limited funding | |
| 22 | 2022 | KALA SECONDARYSCH INTO BOARDING SCHOOL | Kawambwa | KALA | EDUCATION | Not Approved due to limited funding | |
| 23 | 2022 | INSTALLATION OF SOLAR POWER TANKS IN KALA | Kawambwa | KALA | WATER | Not Approved due to limited funding | |
| 24 | 2022 | CONSTRUCTION OF UNDER-FIVE SHELTER AT KALA COMMUNITY. | Kawambwa | KALA | HEALTH | Not Approved due to limited funding | |
| 25 | 2022 | CONSTRUCTION OF HEALTH POST AT CHUNGU COMMUNITY | Kawambwa | KALA | HEALTH | Approved | |
| 26 | 2022 | Renovation of st Marys special school | Kawambwa | Kawambwa | EDUCATION | 174,736.00 | Approved |
| 27 | 2022 | Renovation of Musambeshi Health Post | Kawambwa | Iyanga | HEALTH | 125,612.05 | Approved |
| 28 | 2022 | Rehabilitation of 1X3 CRB at Kawambwa Secondary School | Kawambwa | Kawambwa | EDUCATION | 260,085.00 | Approved |
| 29 | 2022 | Renovation of st Marys special school | Kawambwa | Kawambwa | EDUCATION | 145,983.00 | Approved |
| PAMBASHE CDF COMMUNITY PROJECTS - 2022 | ||||||
|---|---|---|---|---|---|---|
| S/N | Year | Project Description | Constituency | Ward | Sector | Comments |
| 1 | 2022 | Construction Of School Toilets at Kaka Primary School | PAMBASHE | PAMBASHE | EDUCATION | Approved |
| 2 | 2022 | 1*3 Class Room Block (Kota Primary) | PAMBASHE | CHIKANDA | EDUCATION | Approved |
| 3 | 2022 | 1*3 Class Room Block And A Three bedroomed House At Alex Primary School | PAMBASHE | CHIBOTE | EDUCATION | Approved |
| 4 | 2022 | Water Reticulation At Chimpempe School | PAMBASHE | KABANSE | WATER AND SANITAION | Approved |
| 5 | 2022 | Staff House At Chinombwe Primary School | PAMBASHE | ILOMBE | EDUCATION | Approved |
| 6 | 2022 | Construction Of 1 X3 Class Block At Ntumbo Primary School | PAMBASHE | CHIKANDA | EDUCATION | Approved |
| 7 | 2022 | Construction Of Three Bedroomed Staff Houses At Kabanda Police Post | PAMBASHE | KABANSE | SECURITY | Approved |
| 8 | 2022 | Construction Of 1*3 Classroom Block at Kuyumba Primary School | PAMBASHE | FILENGE | EDUCATION | Approved |
| 9 | 2022 | Construction Of 1 X3 Class Block At Mukangwa | PAMBASHE | CHIMPILI | EDUCATION | Approved |
| 10 | 2022 | Construction Of 1*3 Clasroom Block Sichungu | PAMBASHE | MULUNDA | EDUCATION | Approved |
| 11 | 2022 | Construction Of 1*3 Clasroom Block at Musungu Primary School | PAMBASHE | LUONGO | EDUCATION | Approved |
| 12 | 2022 | Purchase Of Desks | PAMBASHE | CHIBOTE WARD | EDUCATION | Approved |
| 13 | 2022 | Fuel For Selcted Feeder Roads In The Consituency | PAMBASHE | PAMBASHE | ROADS | Approved |
| 14 | 2022 | Construction Of 1*3 Class Room Block at Folotiya Primary School | PAMBASHE | CHIKANDA | EDUCATION | Approved |
| 15 | 2022 | Construction Of 1*3 Class Room Block Lengwe Kapenya | PAMBASHE | FILENGE | EDUCATION | Approved |
| 16 | 2022 | Construction Of Staff House At Poosa | PAMBASHE | KABANSE | EDUCATION | Approved |
| 17 | 2022 | Construction Of Staff House At Kanga Community School | PAMBASHE | CHIMPILI | EDUCATION | Approved |
| 18 | 2022 | Construction Of Staff House At Chama Rural Health Post | PAMBASHE | MULUNDA | HEALTH | Approved |
| 19 | 2022 | Construction Of Health Post At Kasonde Community | PAMBASHE | LUONGO | EDUCATION | Approved |
| 20 | 2022 | Installation Of Water Reticulation At Catholic Church | PAMBASHE | CHIBOTE | WATER AND SANITAION | Approved |
| 21 | 2022 | Purchase Of Desks | PAMBASHE | ALL WARD | EDUCATION | Approved |
| 23 | 2022 | Construction Of A Staff House At Mishingo Community School | PAMBASHE | KABANSE | EDUCATION | Approved |
| 24 | 2022 | Construction Of 2 Staff Houses at Buyaka Primary School | PAMBASHE | ILOMBE | EDUCATION | Approved |
| 25 | 2022 | Construction Of A Staff House at Mukangwa Primary School | PAMBASHE | CHIMPILI | EDUCATION | Approved |
| 26 | 2022 | Construction Of Staff House At Musungu Police Post | PAMBASHE | LUONGO | SECURITY | Approved |
| 27 | 2022 | Purchase Of Desks | PAMBASHE | ILOMBE | EDUCATION | Approved |
| 28 | 2022 | Mushota Modern Market-Phase 1 | PAMBASHE | ILOMBE | COMMERCE AND TRADE | Approved |
| 29 | 2022 | Construction Of Borehole at Pambashe Primary School | PAMBASHE | PAMABSHE | EDUCATION | Approved |
| 30 | 2022 | CONSTRUCTION OF 1X3 CRB AT CHIKUNI PRIMARY SCH AND TEACHERS HOUSES. | PAMBASHE | CHIBOTE | EDUCATION | Not Approved due to limited funding |
| 31 | 2022 | 2 SEMI DETATCHED STAFF HOUSE | PAMBASHE | CHIBOTE | EDUCATION | Not Approved due to limited funding |
| 32 | 2022 | CONSTRUCTION OF 1X3 CRB AT KATOTA ZONE | PAMBASHE | CHIBOTE | EDUCATION | Not Approved due to limited funding |
| 33 | 2022 | DAMWALL REPAIR / FURROW REHABILITATION | PAMBASHE | CHIBOTE | WATER | Not Approved due to limited funding |
| 34 | 2022 | INSTALLATION OF BOREBOLES AT KOTA ZONE /VILLAGES | PAMBASHE | CHIKANDA | WATER | Not Approved due to limited funding |
| 35 | 2022 | CONSTRUCTION OF PRIMARY SCHOOL IN CHIFUNDO AREA. | PAMBASHE | CHIKANDA | EDUCATION | Not Approved due to limited funding |
| 36 | 2022 | REHABILITATION OF FEEDER ROADS | PAMBASHE | CHIKANDA | EDUCATION | Not Approved due to limited funding |
| 37 | 2022 | INSTALLATION OF BOREBOLES AT MYAFI VILLAGES | PAMBASHE | CHIKANDA | WATER | Not Approved due to limited funding |
| 38 | 2022 | INSTALLATION OF BOREHOLES AT MANDELEMBWE VILLAGE | PAMBASHE | CHIKANDA | WATER | Not Approved due to limited funding |
| 39 | 2022 | Rehabilitation of CRB at Chimpempe primary school | PAMBASHE | KABANSE | EDUCATION | Approved |
| 40 | 2022 | Rehabilitaion of CRB at Mushota primary school | PAMBASHE | ILOMBE | EDUCATION | Approved |
CONTACT INFORMATION
Kawambwa Town Council,
P.O Box 730001,
Independence Avenue, Civic centre,
Kawambwa, Luapula Province, Zambia.
Public Relations: +26 097794184
E-mail: luapula.kawambwadistrictcouncil@gmail.com
©2022. SMART Zambia Institute. All Rights Reserved.